Recommended Action:
Approve the requested temporary use permit for parking in two phases, as follows:
1. Until December 31, 2018, without any improvements to the site.
2. Any use of the property for parking beyond 2018, until December 31, 2020 (with the option for one 1-yr administrative extension until December 31, 2021) will require the following improvements:
a. removal of the existing building slab
b. installation of a min. 6 in. deep of DTO #4 stone or larger; alternatively, a 4 in. asphalt millings base with 1 in. of asphalt topping is acceptable. This surface must be installed in the location of the building slab (to be removed) and any other potholes and uneven surfaces of the property to ensure a smooth, uniform surface.
c. Installation of parking lot striping to code, delineating individual parking spaces.
d. Installation of landscaping to form a solid hedge min. 30 in. tall at planting, along both the Orange Ave. and Pennsylvania St. frontages. |