Summary:
The following sealed bids were received in response to the subject solicitation:
Supplier |
Bid Amount |
Wharton-Smith, Inc., Sanford, FL |
$6,363,730.00 |
TLC Diversified, Inc., Palmetto, FL |
$6,524,580.00 |
RTD Construction, Inc., Zephyrhills, FL |
$6,716,428.00 |
WPC Industrial Contractors, LLC., Jacksonville, FL |
$6,767,080.00 |
Prime Construction Group, Inc., Orlando, FL |
$7,251,080.00 |
The project will include demolition of the existing pumping system and replacement of the Wetlands PS pumps, discharge piping, new electrical building, new electrical power and control system systems, improvements to the ERRWDS/Wetlands transmission system interconnect, aluminum covers on various post treatment basins, relocation of a submersible pump located in Post Aeration basin, demolition of approximately 325 LF of above ground ductile iron miscellaneous site work, concrete pad improvements, piping and appurtenances.
The Procurement and Contracts Division and Public Works Department have evaluated these bids and recommend award to the lowest, responsive and responsible bidder, Wharton-Smith Inc. of Sanford, Florida, for the Iron Bridge Regional Water Reclamation Facility Wetlands Pump Station Improvements Project in the amount of $6,363,730.00.
The bids were reviewed by the M/WBE office for compliance with the program. Wharton-Smith, Inc. M/WBE Participation Plan for this contract is as follows:
JB Mechanical, Inc. |
MBE |
$62,000.00 |
1.00% |
HVAC |
HZ Construction, Inc. |
MBE |
$65,417.00 |
1.00% |
Painting & Coatings |
EM Paving |
MBE |
$27,800.00 |
0.40% |
Paving |
PES, LLC. |
MBE |
$21,700.00 |
0.30% |
Surveying |
Winter Garden Grassing, Inc. |
WBE |
$12,950.00 |
0.20% |
Seeding & Sodding |
Total M/WBE Participation |
|
$189,857.00 |
2.90% |
|
|